Siddhi Rubber India Pvt. Ltd. is a trusted manufacturer specializing in the research, development, and production of high-quality construction materials for civil engineering projects. Since our establishment, we have been committed to delivering innovative, durable, and cost-effective solutions that meet the evolving demands of the construction industry. Our key products include: Polymer Strips for Reinforced Earth Retaining Walls Prefabricated Vertical Drain (PVD/PBD) Systems for efficient ground improvement and water drainage applications Since 2014, when we successfully developed and introduced Polymer Strip materials to the Indian market, we have continuously focused on innovation, quality, and customer satisfaction. Our commitment to excellence has earned us the prestigious ISO 9001 Certification, reflecting our adherence to internationally recognized quality management standards. Today, Siddhi Rubber India Pvt. Ltd. serves both domestic and international markets, delivering reliable engineering solutions for infrastructure and civil construction projects. Through continuous quality control, advanced manufacturing processes, and ongoing technological development, we strive to provide products that exceed customer expectations. In today's era of globalization and intense market competition, every member of Siddhi Rubber India Pvt. Ltd. is dedicated to reducing costs, developing innovative technologies, and delivering superior value to our customers. Our mission is to build long-term relationships by providing high-performance products, dependable service, and sustainable engineering solutions. At Siddhi Rubber India Pvt. Ltd., quality, innovation, and customer satisfaction remain at the heart of everything we do.
Polymer Strip
"Sidhhi"is a geotextile material used for reinforced earth type retained wall in civil engineering works such as road, harbor and bridge works. It restrains the lateral displacement of soil and increases the durability of soil and stability of its shape, thus increasing the workability, stability and cost down in civil engineering work
Charchterstics Of Method
Economical:
As the land can be effectively used and the wall can be designed and constructed according to the wall structure in the site, the construction cost can be reduced.
Easy to work:
As the materials are supplied in the form of finished products, and the wall can be constructed by simply assembling the products and constructing the foundation, the work period can be shortened and the work can be easily finished.
Excellent Machnical Stability
As the product is resistant to erosion and corrosion by bacteria or organic microbe, it is eco-friendly and durable materials. In the forming of soil structure, it constrains the lateral displacement of soil and induces the apparent adhesiveness that it increases the tension strength and maintains the stability against earthquake and vibration.
- Dig out soil for foundation and conduct compaction. Then, according to the design line of retaining wall, pour the concrete for foundation.
- After curing, make the surface flat using mortar.
- ·Install the panel on the foundation at the spacing of 1.5m and then install the standard panels between the previous panels. Adjust the line, joint and slope of panels.
- Fix the panels so that they are not deformed by the compaction and fix the panels each other by using the clamps. In addition, install the filler for vertical joint which has drain and filtering functions.
- Conduct the backfilling from foundation to first link and compaction.
- Fix the rebar on the back of the fiber reinforcing material as distanced by design length.
- Place the polymeric strips materials between the rebar and links for panel.
- At this time, the polymeric strips materials shall be full tensioned.
- Fix the rebar on the back of the fiber reinforcing material as distanced by design length.
- Place the polymeric strips materials between the rebar and links for panel.
- At this time, the polymeric strips materials shall be full tensioned.
- Repeat the works described above up to the design height and start the required structure over it.